For Oil Immersed Power Transformer, we can produce voltage from 35kV to 500kV, capacity upto 460MVA. We use the best quality of raw material and advance design software to provide low noise, low losses, low partial discharge and high short-circuit impedance for power transformer.
Our power transformer are widely used in national grid, city grid, rural grid, power plant, industrial and mining enterprise, and petrochemical industry.
Cast Resin Transformer,Power Transformer,Renewable Transformer,Power Transformer With Oltc Hangzhou Qiantang River Electric Group Co., Ltd.(QRE) , https://www.qretransformer.com
1. Inquiry purchase number: SZCH2009-X-033
2. The content of the purchased goods and the division of the tenders:
Bid number, cargo name, matching lamp brand/model
(including light source, electrical appliance) Unit quantity remarks
1 Projection lamp ZY200150W green metal halide lamp cover 96 Technical requirements and drawings and other information are obtained from the bidding agency
ZY200150W white metal halide lamp cover 39
2 buried light fixture REGGIANI 5929/
150W green metal halide lamp cover 40
REGGIANI 5929/
150W white metal halide lamp cover 7
REGGIANI 5929/
NG 150W set of 12
3 LED Flood Lights Jinhao Sunshine Source LED Green 30W Set 12
Jinhao Sunshine Source LED White 30W Set 2
Jinhao Sunshine Source LED Yellow 30W Set 6
Jinhao Sunshine Source LED Red 30W Set 9
Note: A set of 1:1 samples of all goods in the purchase list must be provided at the time of bidding. Sample delivery location: Suzhou City Lighting Management Office Warehouse (No. 1172 Jinmen Road). Sample delivery time: before 11:00 am on July 10, 2009.
3. Deadline for submission of inquiry response documents: before 11:00 am on July 10, 2009.
4. The place where the inquiry response file is submitted: Suzhou Chenghe Tendering and Consulting Co., Ltd. (the second floor of the courtyard of the 461 Hsinchu Hotel, Zhuhui Road)
5. Respond to the quotation requirements:
(1) One of the bidding sections may be selected at the time of bidding, or bidding may be made for all bidding sections, but the bidding quotation response shall be quoting all the contents of the bidding section, and the quotation shall include all equipment items and auxiliary materials listed in the whole set of schemes. , labor, machinery, transportation, warehousing, insurance, labor insurance, various taxes, patents, and warranty periods.
(2) If the supplier responds to the transaction, the agency service fee shall be paid to the agency within 6 weeks after signing the purchase contract. The supplier should consider the cost in response to the quotation.
6. Technical requirements for purchasing goods: in accordance with relevant state regulations.
7, after-sales service requirements:
(1) Implemented according to relevant standards of the country and industry and the commitment of the supplier;
(2) The quality guarantee period is one year after the purchaser has installed and commissioned and accepted the inspection.
8. Supplier qualification requirements: Enterprises with independent legal personality.
9, other requirements:
(1) Acceptance of the product includes: quantity, appearance, quality, performance and attached parts should meet the performance requirements, flaws and defects, quality is qualified products, and there are clear manufacturers. The transaction supplier is responsible for the return, replacement and repair of the quality problem, so the costs incurred are the responsibility of the transaction supplier.
(2) Place of delivery of purchased goods: The demand side specifies the site (within the urban area of ​​Suzhou);
(3) Delivery time of purchased goods: 15 days after the contract is signed, the goods are required to be supplied by the purchasing unit.
(4) Acceptance criteria for purchased goods: subject to the bidding documents, supplier's commitments and industry-related standards.
(5) Acceptance time of purchased goods: within one week after installation and commissioning.
(6) Payment method for purchasing goods: The contract is signed and effective, and the purchased items are delivered to the delivery place and paid within 7 working days after the purchaser has completed the acceptance inspection.
10. Requirements for the production of response documents:
(1) The supplier shall submit a "List of Inquiry Response", "Quote Schedule", After-sales Service Commitment (to be stamped with the official seal of the company), and a copy of the industrial and commercial business license in accordance with the requirements of this inquiry request (subject to the official seal of the unit) ), relevant agency qualifications (subject to the official seal of the unit). The above documents shall be bound into a booklet and sealed, and the seal shall have the official seal of the supplier. The name of the responding unit, contact person, contact address, contact number and the number of this inquiry notice should be indicated on the cover.
(2) The format of "Inquiry Response List" and "Quote List" can be found in the annex;
(3) "Inquiry Response List" and "Quote Schedule" must be stamped with the official seal of the unit.
When the total price of the "Inquiry Response List" and the "Quote List" are inconsistent, the inquiry response list shall prevail. The unit price in the quotation list at the time of settlement shall be based on the "quote of the inquiry response list" and the total price of the "quotation list". The ratio floats in the same direction. The quotation of the "Inquiry Response List" and the "Quote of the quotation" are subject to capitalization.
11. Evaluation method for inquiry response: Under the premise of the procurement budget and not exceeding the maximum price limit, in line with the procurement demand, quality and service, the supplier who proposes the lowest quotation and does not exceed the maximum price limit is the transaction supply. Business.
12. Any supplementary explanations and amendments involving the inquiry notice shall be subject to the correction or supplementary notice on the Suzhou Government Procurement Online. ().
13. A brief summary of this inquiry notice is published in the “City Business Dailyâ€. The specific content is published on the Suzhou Government Procurement Network ().
14. Purchasing unit:
Name of Unit: Suzhou City Lighting Management Office
15. Tendering agency:
Name: Suzhou Chenghe Tendering Consulting Co., Ltd. Company Name: Suzhou Chenghe Tendering Consulting Co., Ltd. Contact: Chen Gang Tel: 0512-65161672, 65161792 E-mail: Fax: 0512-65262733 Postal Code: 215007 Address: Suzhou City The second floor of the courtyard of 461 Hsinchu Hotel, Zhuhui Road
Announcement of Greenland LED Landscape Equipment Inquiry Purchasing on the West Side of Linton Road
Title: Linton Road West Side Greenland LED Landscape Equipment Inquiry Procurement Announcement Tender No.: SZCH2009-X-033 Announcement Date: July 6, 2009 Deadline: July 10, 2009 Tendering Agency: Suzhou City Lighting Management Departments and cities: Jiangsu Province - Suzhou City Content: Our company is entrusted by Suzhou City Lighting Management Office to conduct inquiry and purchase for the green space landscape equipment on the west side of Linton Road, and welcome qualified suppliers to participate.