Horizontal Pair Twisted Cable,Shield Communication Cable,Utp Cat5E Cable,Unshield Communication Cable Baosheng Science&Technology Innovation Co.,Ltd , https://www.cablebaosheng.com
1. ISO and CE Certificate
2.20 years production experience
3. Material: Q235, Q345, Q420B
4. Hot DIP galvanization
5. OEM is welcome
6. High quality with reasonable price
7. Can produce various height and structural tower
8. Monthly production capacity can reach 20000 Metric tons
Performance Standard
Besides conforms to the drawing and design, the materials and fabrication of tower components shall conform to the following standards (Chinese Standards) and customer's requirements.
Steel pipe/angle/hybrid tower welding requirements
1 )we used CO2 welding and submerged arc auto welding or other methods.
2 )Welded seam shall be full penetration and grinded.
3 )The welded product has no fissure, scar, overlap, layer or other defects.
Steel tower Galvanization/color painting
All steel items, bolts, nuts, washers & other components to be hot -dip galvanized with uniform. As per (ASTM-A-123). Paiting for corrosion proof
Company Hardware Configuration
1. The company has advanced digital physical and chemical laboratory.
2. We have one 2800 tons CNC bending machine, have two domestic advanced digital automatic production line for steel pipe tower, have 6 automatic numerical control robot welding system, have one Steel tube joint welding machine, have 3 CNC plasma flame cutting machine, have 5 High speed CNC Angle steel line and steel plate production line, one CNC tower foot welding robot system., 2CNC Plane drilling machine, 1 sand shot blasting machine, 1 gantry type submerged arc welding machine. 6 cutting/shearing machine
3. Annual production capacity of 150, 00 tons of hot galvanizing line and one Automatic centrifugal bolt galvanizing line.
Management and technical advantages
1.2009 ERP production management system
2.2014 We are China steel structure association membership.
3.2012-2014, we are provincial star enterprise.
4.2013-2014 we have AAA credit grade, which awarded by Agricultural bank.
5.2011 We got ISO 9001: 2008 standard certificate.
6.2013 we got OHSAS 18001: 2007 standard certificate
7.2012We were patent enterprise
8. Contract & promise keeping enterprise for 5consecutive years awarded by Qingdao business executive management bureau.
9. Engineering construction & installation qualification enterprise grade II
Steel pole tower /angle steel tower
1. Our products have high resistivity against heat, humidity, moisture, water etc.
2. Owning to use the rare earth special craft during the production process, to ensure its high precise, good quality and competitive advantage. Meanwhile, we can accept the product type damage test to ensure the high safe factor of our products.
3. Because of good quality and competitive price caused by innovation and management reform, experienced service in fabrication, design, installment, consultancy, we have built longterm relationship with many countries, such as America, Morocco, Sir Lanka, Russia, Jordan, Guyana, Nigeria, Australia, Spain, Indonesia, Singapore, the Philippines, Kenya, etc.
Why Choose us?
* Tower Design tailor made to your requirements
* Pre Dispatch inspection by buyer or international inspection agency.
* Steel certified as per international.
* Design of Tower as per China/ International design standards.
* Galvanization as per international standard.
* Timely project completion.
* Convenient transportation to Qingdao port & airport(only one hour)
* We are manufacturer. We have our own land & factory. The land was bought instead of rent.
* Independent import & export authorization from government. Price is competitive
Height
5-100M
Wind Pressure
0-300 KM/H
Structure
Overlap Connection
Material
Q345B/A572, minimum yield strength >=345MPA; Q235B/A36, minimum yield strength>=235MPA
Details & Shape
Can be designed as per customer's requirement
Good's Description
Cable and Ladder can be assembled by customer's request
Lifetime
20years
Main Pole Lifetime
More than 20 years
Barks
Hot Dip Galvanization and Special Tree Gluewater
Delivery Time
28 days after receiving deposit
Galvanizing Standard
EN ISO 1461,ASTM/A123 or equivalent
Working & Resting Platform Quantity
1-3 PCS
Antenna Support
3-18 PCS
Microwave Dish
3-18 PCS
Manufacturing and Workmanship
BS449 or AISC
Welding Standard
BSEN287, BSEN288 or equivalent
Nuts& Bolts
Grade 8.8
Spare parts
All Necessary parts, e.g. Antenna Mount pole and Brackets , Climbing Steps, Safety Guide Cable, Lightning Rod, Mounting bracket for Obstruction light,  Holding down bolts/nuts, and all other bolt and nuts required for erection and installation