Steel 80m Telecom Shelter Self Supporting Tower

  • Model NO.: LS-T06
  • Conductor Circuit: Multi Circuit
  • Materials: Steel
  • Style: Cable Tower
  • Name: Steel 80m Telecom Shelter Self Supporting Tower
  • Avaivable Height: 5-100m
  • Wind Pressure: 5-180 Km/H
  • Installation on Site: Yes
  • Payment Way: 30% Down Payment
  • Trademark: LU STAR
  • Specification: Telecom tower
  • HS Code: 73082000
  • Usage: Flying Angle Tower, Crossing Tower, Tension Tower, Angle Tower, Terminal Tower, Transposition Tower, Branching Tower
  • Certification: ISO
  • Standard: Standard
  • Structure: Y Type
  • Material: Q345b/A572
  • Galvanized: Hot DIP Galvanization
  • Antenna Support Quantity: 3-18 PCS
  • Worker Training: Yes
  • Lifespan: 25 Years
  • Transport Package: by Sea or Land
  • Origin: China

Steel 80m Telecom Shelter Self Supporting Tower

Specification:

Avaivable Height:   5-100M
Wind Pressure:  5-180 KM/H
Material:  Q345B/A572,minimum yield strength >=345N/mm2;
Q235B/A36,minimum yiled strenght>=235N/mm2;
Galvanized:  Hot Dip Galvanization
Delivery Lead Time:    25 Days after receiving 30% Deposit
Lifetime:  Minimum 25 years
Working & Resting Platform Quantity:    1-3 PCS
Working & Resting Platform Quantity:    3-18 PCS
Antenna Support Quantity :    3-18 PCS


Performance Standard :
Besides conforms to the drawing and design, the materials and fabrication of tower components shall conform to the following standards (Chinese Standards) and customer's requirements. 
Steel pipe/angle/hybrid tower welding requirements 
1).we used CO2 welding and submerged arc auto welding or other methods. 
2).Welded seam shall be full penetration and grinded. 
3).The welded product has no fissure, scar, overlap, layer or other defects. 
Steel tower Galvanization/color painting
All steel items ,bolts ,nuts ,washers & other components to be hot -dip galvanized with uniform. As per (ASTM-A-123).paiting for corrosion proof

Welded requirements:
We used CO2 welding and submerged arc auto welding or other methods
Welded seam shall be full penetration and grinded
The welded product has no fissure, scar, overlap, layer or other defects
Galvanization:
All components are hot-dip galvanized with uniform

Steel 80m Telecom Shelter Self Supporting Tower

Related Production:

Power Transmission Line Tower
Communication Tower
Substation Steel Structure
Flare Tower
LSAW Steel Pipe

Steel 80m Telecom Shelter Self Supporting Tower
Our Project

>>.Ethiopian 400kv substation
>>.Macao University of Science&Technolofy Stadium
>>.The China Petroleum University Gymnasium
>>.Wuhan Qiantai Theater
>>.The Stadium Of Zibo City
>>.Huizhou Stadium

Steel 80m Telecom Shelter Self Supporting Tower

Quality Test:
Before put into production, all the material must pass the chemical and physical analysis to make sure that they have met the requested strength and component. we have more than 15 inspection procedures from incoming raw material to finished products

Before shipment, we have a final inspector manager to check the products on every detail and component to make sure it all meet the drawing.

Company Advantage:
1. The company has advanced digital physical and chemical laboratory.   
2. We have one 3000 tons CNC bending machine, have two domestic advanced digital automatic production line for steel pipe tower, have 6 automatic numerical control robot welding system, havetwo Steel tube joint welding machine , have 4 CNC plasma flame cutting machine, have 6 High
speed CNC Angle steel line and steel plate production line, one CNC tower foot welding robot system. ,2 CNC Plane drilling machine,1 sand shot blasting machine, 1 gantry type submerged arc
welding machine.6 cutting/shearing machine  
3. Annual production capacity of 200, 00 tons of hot galvanizing line and one Automatic  centrifugal bolt galvanizing line. 
Steel 80m Telecom Shelter Self Supporting Tower


Steel 80m Telecom Shelter Self Supporting Tower
Steel 80m Telecom Shelter Self Supporting Tower

Delivery Period :
(1) Less than 100ton: Within 1 Months after receiving the advance payment. 
(2) 100ton ~ 300ton: Within 2 Months after receiving the advance payment. 
(3) 300ton ~ 600ton: Within 3 Months after receiving the advance payment. 
(4) 600ton ~ 1500ton: Within 4 Months after receiving the advance payment. 


Why Choose us? 
* Tower Design tailor made to your requirements 
* Pre Dispatch inspection by buyer or international inspection agency. 
* Steel certified as per international. 
* Design of Tower as per China/ International design standards. 
* Galvanization as per international standard. 
* Timely project completion. 
* Convenient transportation to Qingdao port & airport(only one hour)
* We are manufacturer. We have our own land & factory. The land was bought instead of rent.
* Independent import & export authorization from government.
* Price is competitive

 

Dell Adapter

Laptop power adapter charger for Dell:

Laptop Model Adapter Output
Latitude E5400 E5410 E5500 E5510 19.5v 4.62a, 7450
Studio XPS 16 (1645)1640 1645 1647 19.5v 4.62a, 7450
Studio XPS M1645 M1647 19.5v 4.62a, 7450
XPS 14 15 17 L501x L502x L702x L702x 19.5v 4.62a, 7450
Inspiron 1464 1564 1764 19.5v 4.62a, 7450
Inspiron 1525 1440 1526 19.5v 3.34a, 7450
Precision M4600 M6600 19.5v 6.7a, 7450
Inspiron N5050 N4010 N5110 19.5v 3.34a, 7450
Inspiron 14Z-N411Z 13Z N311Z 19.5v 4.62a, 7450
Inspiron 1545 19.5v 3.34a, 7450
Latitude E5420 E5530 E5430 E6420 19.5v 4.62a, 7450
Inspiron 1440 1525 1526 1545 1750 19.5v 3.34a, Octagon tip
Inspiron 1300 B120 B130 19v 3.16a/3.42, 5525
Inspiron 1525 1526 1545 19.5v 3.34a, 7450
Studio 1440 1440n 1440z 14z 14zn 19.5v 3.34a, 7450
Latitude E4300 E4310 19.5v 4.62a, 7450
Inspiron 13Z 13ZD 13ZR M301 M301z M301ZD M301ZR N301 19.5v 3.34a, 7450
Inspiron N301Z N301ZD N301ZR 19.5v 3.34a, 7450
Studio 1535 1536 1555 1557 1558 19.5v 4.62a, 7450
Latitude E5420 E5520 E6430 E6530 E6420 E6520 19.5v 4.62a, 7450
Inspiron Mini 10 10v 1010 1010n 1010v 1011 1011n 1011v 19v 1.58a, 5517
Inspiron 14V 14VR M4010 N4020 N4030 19.5v 4.62a, 7450
Inspiron N4110 N5110 N7110 M5010 19.5v 3.34a, 7450
630M 640M E1405 19.5v 4.62a, 7450
Inspiron 15-3521 17-3721 19.5v 3.34a, 7450
Latitude 120L 19.5v 3.34a, 7450
Vostro 1710 1710n 1720 1720n 19.5v 4.62a, 7450
Vostro 1500 1700 Inspiron 1520 1521 1720 19.5v 4.62a, 7450
Vostro 1400 1420 PP26L 19.5v 3.34a, 7450
Latitude D410 19.5v 3.34a, 7450
Inspiron 1120, 1121, M101 19.5v 3.34a, 7450
Inspiron Mini 1012 1018 19v 1.58a, 5517


Our service:

Stable output and high charging efficiency.

Elegant outlook design as original one, touch smoothly and comfortable.

Original charger is good, but as a replacement, our product has more reasonable price when your original charger is broken.

And, the market of the replacement adapters becomes bigger and bigger. People would rather buy a copy one then the original because of the price.

But at the same time, people worry about that they will buy something defective. So the problem comes, how to buy a good quality one with a good price?

As a professional power adapter manufacturer, we have excellent R&D team, skilled staffs and responsible after-sale service. All your benefits can be under protected after you buy products for our company.

Our certificates :ISO9001:2008 & ISO14001:2004 , CCC , CE , FCC , ROHS.

All our products has 1 year warranty. In other words, if you get the dad products which are not damaged physically from us in one year, we will replace you the new one or the whole bulk order.

Mini Charger For Dell,Big Connector Adapter,45W Power Adapter,Dell Computer Adapter

Shenzhen Waweis Technology Co., Ltd. , https://www.waweis.com