Tianhe District, Guangzhou City, Liede River repair works

According to the approval of Sui Fachang [2014] No. 155, the Municipal Rivers Management Office of Tianhe District of Guangzhou City has publicly invited the society for the construction of the Liedeyong River Rehabilitation Project in the Tianhe District of Guangzhou City.

I. Overview of the bidding project:
Project Name: Liede River Rehabilitation Project, Tianhe District, Guangzhou City
Project Overview: The project repair 3.47 kilometers of the total length of the river, starting from the north side of Huacheng Avenue, and finally the exit of the Guangshen Railway Bridge culvert. The main construction content is the restoration of ecological banks and landscape decoration. The restoration of the ecological bank includes the reforestation of ecological bags and floating beds of aquatic plants with 120 m of revetment; the landscape modification includes the restoration of railings on both sides, the repair of pavements, the repair of hydrophilic platforms, leisure kiosks, and the replacement of landscape lights and sign boards.
III. Division of bid sections and bidding content of various bid sections
1. Bid division: a bid section
2. Bidding content: The total length of the river repaired by the project is 3.47 kilometers. It starts from the north side of Huacheng Avenue and finally ends at the exit of the Guangshen Railway Bridge Box & Culvert. The main construction content is the restoration of ecological banks and landscape decoration. The restoration of the ecological bank includes the reforestation of ecological bags and floating beds of aquatic plants 120 meters; landscape decoration includes railing repairs on both sides, restoration of the sidewalks, repair of the hydrophilic platform, leisure kiosks, replacement of landscape lights and billboards, etc., concrete construction drawings And the list of quantities shall prevail.
3. Tender control price: 23.19299 million yuan.
Fourth, sources of funds: financial funds.
V. Duration: 3 months.
Sixth, the contracting method: According to the comprehensive unit price lump sum (workmanship, package material, package quality, time limit, package security, civilized construction package, package acceptance, warranty package), temporary project total cost of lump sum; see the tender documents.
VII Announcement, Registration, and Obtaining Bidding Documents
Announcement date (including today): December 30, 2016 to January 6, 2017
Registration and bidding documents are available from 9:30 to 11:30 in the morning and from 14:00 to 16:00 in the afternoon (except on Saturdays and Sundays).

158mm Mono Solar Panel

In the case of the competition between 182mm and 210mm and the decline of 158mm, Sunket still retains a 158mm production line to meet the needs of customers.


Their exceptional low-light and high-temperature performance enables more flexibility in installation and mounting. Mono PERC may not be suitable for all types of solar projects. However, they are optimal for residential rooftop installations, where faster ROI and lower installation costs are the driving factors.


The standard monocrystalline cell presents a uniform back surface field (BSF), whereas the mono PERC Solar Cell presents local BSF atop passivation and SINx capping layers, which significantly improves the capture of light and electrons.


Your solar panels need to be exposed to sunlight in order to produce power. However, unless you live somewhere with high amounts of smog, dust, dirt or sand blowing around, Solar Panel cleaning is generally not necessary.


How long do solar panels last?
about 25 to 30 years
But the solar panels generating that power don't last forever. The industry standard life span is about 25 to 30 years, and that means that some panels installed at the early end of the current boom aren't long from being retired.

158mm Solar Panel,158.75mm Solar Cell,158 Solar PV Module,6 inch Solar Panel,Solar PV Module

Wuxi Sunket New Energy Technology Co.,Ltd , https://www.sunketsolar.com