(Part 2 of Bidding) Bidding Announcement on Datang Fan Foundation and Hoisting Construction for Datang Shanxi Co., Ltd. Distributed 28.5MW Wind Farm Project

(Part 2 of Bidding) Bidding Announcement on Datang Fan Foundation and Hoisting Construction for Datang Shanxi Co., Ltd. Distributed 28.5MW Wind Farm Project

Pursuant to the Law of the People’s Republic of China on Tendering and Bidding, the Regulations on the Implementation of the Tender and Bidding Law of the People’s Republic of China, and relevant laws and regulations, the principle of openness, fairness, impartiality, and good faith has been followed and entrusted by Datang Shanxi New Energy Co., Ltd. The wind turbine foundation and hoisting construction of the distributed 28.5 MW wind farm project in Tangshan Shanxi were conducted in domestic open tender, and the units that meet the qualification requirements are welcome to participate.

I. Project Description:

The Biden Decentralized 28.5MW Wind Farm has been approved by the Shanxi Provincial Development and Reform Commission and was approved by Jinfafa Energy (2014) No. 1617. The owner of the project is Datang Shanxi New Energy Co., Ltd. For Datang Shanxi New Energy Co., Ltd., the ratio is 100%; the capital source is project capital and financing, and the capital ratio is 20%. The bidder was Datang Shanxi New Energy Co., Ltd. The project has already met the conditions for bidding. The project is now undergoing open bidding. Construction Site: Yuxian County, Shanxi Province (District) Construction Scale: 28.5MW Planned duration: May 1, 2017 to March 20, 2018, 324 calendar days.

Second, the scope of the tender:

Fans and fans became the foundation, fans and fans were installed, and fan cables were installed and installed.

Third, the bidder's qualification requirements:

3.1 The bidder must have independent legal person qualifications and corresponding construction qualification conditions. Non-PRC registered bidders should be registered by the Administration for Industry and Commerce, and the competent construction department should issue a contracted project permit to issue a permit.

3.2 The bid invitation requires the bidder to have qualifications of Grade A and above in general contracting for construction projects, and must have construction performance of 2 or more wind farms of 50 MW and above or similar projects in the past 5 years, and in personnel, equipment and funds. Other aspects have corresponding construction capabilities.

3.2.1 Among them, the bidder intends to send the project manager to be qualified as a qualified mechanical and electrical professional registered construction engineer, possess an effective safety production assessment certificate (B), and has not held any other engineering project manager's position, and has 5 More than a year engaged in similar project management work experience and as a project manager of 2 or more wind farms or similar projects of 50 MW and above.

3.2.3 Passed GB/T/ISO 9001:2008 Quality Management System, GB/T/ISO 14001:2004 Environmental Management System, GB/T/OHSAS 18001:2007 Occupational Health and Safety Management System Certification.

3.3 Corporate Finance: The registered capital is not less than RMB 40 million.

3.4 Corporate reputation: The bidder needs to have good credit standing and business reputation. There is no legal dissolution of the case or the company is out of business or in bankruptcy, and the assets have not been reorganized, taken over and frozen.

3.5 This tender does not accept the Commonwealth bid.

3.6 The tender will be conducted after the qualification examination. After the bid opening, the bid evaluation committee will review the bidder's qualifications. The qualification conditions do not meet the requirements of the bidding documents. The bid evaluation committee will reject the bid.

Fourth, the tender documents obtained:

4.1 Ways to Obtain Bidding Documents: Log in, apply for the bidding document with the company's CA certificate electronic key and follow-up bids.

4.2 Bidding Documents Available: November 15 to November 25, 2016.

2) The result of the purchase is subject to the platform.

4.3 After the tender has adopted the post-qualification method, the bid evaluation committee will review the qualifications of the bidders after the bid opening. The bidders' bids that do not meet the requirements of the tender notice will be treated as rejected bids.

V. Submission of tender documents:

5.1 Deadline for submitting tender documents (Bid deadline, the same below): December 10, 2016, 10:00 am.

5.2 Delivery Location: Beijing.

5.3 Ways of submission: Prior to the deadline for submitting tender documents, potential bidders submitted paper tender documents and their electronic versions according to the requirements of the tender documents, and completed the electronic uploading and uploading of electronic tender documents on e-commerce platforms. Written documents submitted late or not delivered to designated locations or not sealed as required will not be accepted by the tenderee.

5.4 Other submission methods and issues requiring attention: The electronic version of the bidding documents needs to be submitted on the platform, and the electronic opening and evaluation of bids shall be implemented. At the opening of the bid, the tenderer’s written bid documents will not be opened or singed, and they will only be used for archiving purposes.

The opening of the bid is subject to the electronic bid opening method. For bidders who are not familiar with the online bidding operation, we will hold a training conference.

Contact: Qian Yong

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.

Lubrication System

Lubrication System,Lube Oil System,Dry Sump Lubrication System,Engine Lubrication System

Chongqing LDJM Engine Parts Center , https://www.ckcummins.com