(Tender II) Datang Henan Henan Yichuan Wananshan Wind Power Project Survey Design and Tender Announcement

(Tender II) Datang Henan Henan Yichuan Wananshan Wind Power Project Survey Design and Tender Announcement

Pursuant to the "Law of the People's Republic of China on Tendering and Bidding", the "Regulations on the Implementation of the Tender and Bidding Law of the People's Republic of China" and relevant laws and regulations, the principles of openness, fairness, impartiality, and good faith are entrusted by Datang Henan Clean Energy Co., Ltd. Datang Henan Henan Yichuan Wan’anshan wind farm project survey and design has been openly tendered in China, and the units that meet the qualification requirements are welcome to participate.

I. Project Description:

Project Name: Datang Yichuan Wan'anshan Wind Farm Project Location: Yichuan County, Luoyang City, Henan Province Current Capacity: 30MW Unit Type: Wind Turbine Project Entity: Datang Henan Clean Energy Co., Ltd. Design time requirements: Under the premise that the entrusting party provides the relevant basic information, complete the preliminary design, tender design and construction drawing phase of all survey design and service work according to the project company approved schedule. 1) After the contract is signed, the wind turbine bidding technical documents will be provided within 20 days according to the request of the entrusting party; 2) After the fan is calibrated, the Design Institute will complete the micro-site selection of the fan within 30 days; 3) Provide the road within 25 days after the microsite is selected Drawings and tendering technical documents for road construction bidding; 4) Wind turbine foundation and grounding, blower installation bidding quantity list and bidding technical documents, wind turbine construction and construction bidding within 25 days after providing basic data; providing tower tendering technology The documents will be used for the bid invitation of the tower; 5) After the contract is signed, the design of the booster station shall be provided within 20 days according to the request of the entrusting party, submitted to the project company for review, and submitted to the design institute within 25 days after the completion of the inspection. Technical documents for civil installation and construction of power collection lines and booster stations, fire protection construction, and settlement observation tender; provision of substation equipment inventory and bidding technical documents for box change, main transformer, high and low voltage switchgear, GIS and auxiliary equipment, 35kV Power compensation equipment bidding work; 6) After the booster station program design review is completed, within 40 days Design Institute to provide comprehensive automation and protection equipment, DC power supply, cables and accessories strokes mining equipment inventory and technical tender documents, tender work carried out in this area of ​​the device. The final progress requirements shall be implemented according to the agreement of both parties.

Second, the scope of the tender:

From the preliminary design to the whole process of unit production and survey bidding. Including the following but not limited to: Review of the results of wind turbine type selection in the feasibility study report (if there are major deviations, re-engineer the fan selection report), topographic map mapping, wind field geological survey, wind resource review, fan microscopic Site selection, wind farm approach roads and maintenance road survey and design, fan and wind turbine chassis base survey design, booster station civil construction and installation design, 35kV collector circuit civil and installation design, grounding grid design, all civil engineering inspection pile inspection . The survey, preliminary design and budget estimation of the entire wind power project, construction drawing design, as-built drawing preparation, technical services (including design drawings and on-site design, etc.) and technical documentation for the related construction bidding, equipment, and material tendering (including participation Evaluation work and design liaison meeting, work to meet the tendering quantity list, engineering control piles measurement, cooperation with compliance work, labor safety and industrial hygiene, fire protection, safety facilities design, etc. Preparation work, etc. According to relevant regulations, requirements and requirements of Datang Corporation, the project will carry out the optimization design work of this project and cooperate with the completion of the creation of quality projects. Meet all relevant survey and design requirements for the current phase of the project.

Third, the bidder's qualification requirements:

Qualification level of the bidder: The bidder shall have Grade A and Grade A comprehensive design qualification certificates. In the past 5 years, the bidder shall have independently undertaken 2 or more stages of survey and design performance of the wind turbine construction drawings in the mountainous area, and the personnel, equipment, and funds Other aspects have corresponding survey and design capabilities. The proposed project manager shall have the performance of phased survey and design of the construction drawings of mountainous wind power projects that have been independently put into operation for 2 or more years in the past 5 years. Passed ISO9001: 2000 quality management system certification, ISO14001: 2004 environmental management system certification, occupational health and safety management system certification or (OSHMS) occupational safety and health management system certification. Credit rating certificate or bank credit certificate.

The tender does not accept the consortium bid.

Fourth, the tender documents obtained:

4.1 Ways to Obtain Bidding Documents: Log in, apply for the bidding document with the company's CA certificate electronic key and follow-up bids.

4.2 Bidding Documents Available: November 15 to November 25, 2016.

2) The result of the purchase is subject to the platform.

4.3 After the tender has adopted the post-qualification method, the bid evaluation committee will review the qualifications of the bidders after the bid opening. The bidders' bids that do not meet the requirements of the tender notice will be treated as rejected bids.

V. Submission of tender documents:

5.1 Deadline for submitting tender documents (Bid deadline, the same below): December 10, 2016, 10:00 am.

5.2 Delivery Location: Beijing.

5.3 Ways of submission: Prior to the deadline for submitting tender documents, potential bidders submitted paper tender documents and their electronic versions according to the requirements of the tender documents, and completed the electronic uploading and uploading of electronic tender documents on e-commerce platforms. Written documents submitted late or not delivered to designated locations or not sealed as required will not be accepted by the tenderee.

5.4 Other submission methods and issues requiring attention: The electronic version of the bidding documents needs to be submitted on the platform, and the electronic opening and evaluation of bids shall be implemented. At the opening of the bid, the tenderer’s written bid documents will not be opened or singed, and they will only be used for archiving purposes.

The opening of the bid is subject to the electronic bid opening method. For bidders who are not familiar with the online bidding operation, we will hold a training conference.

Contact: Qian Yong

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.

KNB1-32 Miniature Circuit Breaker

KNB1-32 Mini Circuit breakers, also named as the air switch which have a short for arc extinguishing device. It is a switch role, and also is a automatic protection of low-voltage electrical distribution. Its role is equivalent to the combination of switch. Fuse. Thermal Relay and other electrical components. It mainly used for short circuit and overload protection. Generally, According to the poles, mini Circuit breaker can be divided into 1P , 1P+N , 2P, 3P and 4P.


KNB1-32 Miniature Circuit Breaker,KNB1-32 Electronics Miniature Circuits Breaker,KNB1-32 Automatic Miniature Circuit Breaker,KNB1-32 Mini Circuit Breaker

Wenzhou Korlen Electric Appliances Co., Ltd. , https://www.zjmotorstarter.com